- Mon - Sat: 8am - 5pm
- 8, B.T Owumi Road, Sapele, Delta State, Nigeria
- +234-805-502-8735, +1-346-857-6153
Projects
- Home
- Projects
ERIKA PERKINS CONSULT
PROJECTS EXECUTED
EPC TARGET PROJECTS
- Conceptual/ Feasibility Studies
- Front End Engineering Design (Feed)
- Detailed Engineering Design
- Facility Upgrade & Refurbishment.
- Project Management And Field Supervision
- Procurement Services
- Hazard Identification Tools (Hazid)
- Hazard And Operability (Hazop Techniques)
- Offshore Activities Risk Assessment Review
- Bowtie
- Safety Integrity Level (Sil Assessments)
- Layers Of Protection Analysis (Lopa)
- Failure Modes Effects And Criticality Analysis (Fmeca)
- Reliability Operability Maintenance (Rom)
- Fire And Explosion Hazards Analysis (Fera/Fea/Fra/Fedha)
- Gas Dispersion And Smoke Ingress Analysis (Gdsi)
- Exhaust Vent Study
- Escape, Evacuation And Rescue Analysis (Eera)
- Emergency Systems Survivability Assessment (Essa)
- Dropped Object (Dos) And Material Handling Study
- Ship/Helicopter Collision And Structural Failure Study
- Transportation Risk Assessment (TRA)
- Fire, Heat And Smoke Detection System Design
- Active Fire Protection (Afp) Design
- Passive Fire Protection (Pfp) Design
- Fire And Gas Mapping
- Fire Dynamics Analysis/Fire Effects Modelling
- 2D And 3D Noise Modelling Of The Platform Facilities.
- Simulation Of Noise Input Data To Overall Sound Level Of Each Noise Emitting Equipment.
- Research And Provision Of Noise Input Data For Each Noise Emitting Equipment On The Platform.
- Identification Of Noise Emitting Equipment On The Platform.
- Interpretation Of The Noise Models Through Special Reflective Surfaces (E.G Plated And Grated Material Surfaces).
- Quantitative Risk Assessment (Qra) For Onshore And Offshore Facilities
- Offshore/Onshore Pipeline Qra
- Miscellaneous Risk Assessments
- Offshore Hse/Safety Case Development
- Hse/Safety Case Updates/Revisions And Bridging Documents
- Hazard And Risk Register Preparation
- Emergency Response Plan (Erp) Development
- Performance Standards (Ps) Development For Safety Critical Elements (Sces)